dima
  • Eurotunnel – Simulator Carriage Refurb

    With a four week deadline, Eurotunnel required their smoke simulator carriage completely refurbished from a standard MKII coach layout to reflect more accurately vehicles used in service. Our engineering team designed a new layout and produced drawings for the interior parts to be manufactured. Our fitting team then completed the refurbishment on schedule and to the satisfaction of the client.